Browse by Year
/ 1998
/ June
/ Friday, June 19, 1998
[Federal Register: June 19, 1998 (Volume 63, Number 118)]
[Rules and Regulations]
[Page 33577-33578]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr19jn98-22]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Coast Guard
33 CFR Part 117
[CGD 08-98-030]
Drawbridge Operating Regulation; Lafourche Bayou, LA
AGENCY: Coast Guard, DOT.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, Eighth Coast Guard District has issued a
temporary deviation from the regulation governing the operation of the
SR 1 vertical lift bridge across Lafourche Bayou, mile 13.3, in
Leeville, Lafourche Parish, Louisiana. This deviation allows the
Louisiana Department of Transportation and Development to close the
bridge to navigation from 7 a.m. until 9 a.m.; 9:30 a.m. until noon;
12:30 p.m. until 3 p.m.; and 3:30 p.m. until 7 p.m., Monday through
Friday, except Federal holidays, from August 3, 1998, until October 2,
1998. This temporary deviation is issued to allow for general
maintenance repairs.
DATES: This deviation is effective from 7 a.m. on August 3, 1998, until
7 p.m. on October 2, 1998.
FOR FURTHER INFORMATION CONTACT:
Mr. Phil Johnson or Mr. David Frank, Bridge Administration Branch,
Commander (ob), Eighth Coast Guard District, 501 Magazine Street, New
Orleans, Louisiana 70130-3396, telephone number 504-589-2965.
SUPPLEMENTARY INFORMATION: The SR 1 vertical lift span bridge across
Lafourche Bayou at Leeville, Lafourche Parish, Louisiana has a vertical
clearance of 40 feet above mean high water in the closed-to-navigation
position. Mean high water elevation is 3 feet above Mean Sea Level
(MSL). Navigation on the waterway consists primarily of fishing
vessels, some tugs with tows and occasional recreational craft.
Presently, the draw opens on signal for the passage of vessels.
The Louisiana Department of Transportation and Development
requested a temporary deviation from the normal operation of the bridge
in order to do maintenance work on the bridge. The work consists of
mechanical, electrical, and structural repairs which require the bridge
to remain in the closed to navigation position for several hours at a
time. During portions of this repair work, scaffolding may be placed
below the bridge over the navigation channel reducing the approved
vertical
[[Page 33578]]
clearance to less than 40 feet above mean high water. The reduction in
the vertical clearance will be approximately 4 feet. Alternate routes
are available. This work is essential for the continued safe operation
of the vertical lift span.
The District Commander has, therefore, issued a deviation from the
regulations in 33 CFR 117.5 authorizing the SR 1 vertical lift span
bridge across Lafourche Bayou, Louisiana to remain in the closed-to-
navigation position from 7 a.m. until 9 a.m.; 9:30 a.m. until noon;
12:30 p.m. until 3 p.m.; and 3:30 p.m. until 7 p.m., Monday through
Friday, except Federal holidays, from August 3, 1998, until October 2,
1998.
Dated: June 11, 1998.
A.L. Gerfin, Jr.,
Captain, U.S. Coast Guard, Acting Commander, 8th Coast Guard Dist.
[FR Doc. 98-16367 Filed 6-18-98; 8:45 am]
BILLING CODE 4910-15-M
Browse by Year
/ 1998
/ June
/ Friday, June 19, 1998
Arizona Landscaping - Internet Marketing - United Specialties - Credit Cards
|
|