Browse by Year
/ 1998
/ June
/ Friday, June 19, 1998
[Federal Register: June 19, 1998 (Volume 63, Number 118)]
[Rules and Regulations]
[Page 33577]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr19jn98-21]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Coast Guard
33 CFR Part 117
[CGD 08-98-023]
Drawbridge Operating Regulation; Dulac Bayou, LA
AGENCY: Coast Guard, DOT.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, Eighth Coast Guard District has issued a
temporary deviation from the regulation in 33 CFR 117.5 governing the
operation of the SR 57 swing span drawbridge across Dulac Bayou, mile
0.6, at Dulac, Terrebonne Parish, Louisiana. This deviation allows the
Louisiana Department of Transportation and Development to close the
bridge from 7 a.m. and noon and from 12:30 p.m. until 3:30 p.m., on
July 6, 7, 8, 13, 14, 15, 20, 21, 22, 27, 28 and 29, 1998. The span
will open for the passage of traffic from noon until 12:30 on each of
these days. The bridge will operate normally at all other times. This
temporary deviation is issued to allow for the cleaning and painting of
the swing span, an extensive but necessary maintenance operation.
DATES: This deviation is effective from 7 a.m. on July 6 until 3:30
p.m. on July 29, 1998.
FOR FURTHER INFORMATION CONTACT: Mr. Phil Johnson, Bridge
Administration Branch, Commander (ob), Eighth Coast Guard District, 501
Magazine Street, New Orleans, Louisiana, 70130-3396, telephone number
504-589-2965.
SUPPLEMENTARY INFORMATION: The SR 57 swing span drawbridge across Dulac
Bayou, mile 0.6, in Dulac, Terrebonne Parish, Louisiana, has a vertical
clearance of 7 feet above high water in the closed-to-navigation
position and unlimited clearance in the open-to-navigation position.
Navigation on the waterway consists of tugs with tows, fishing vessels,
sailing vessels, and other recreational craft. The Louisiana Department
of Transportation and Development requested a temporary deviation from
the normal operation of the bridge in order to accommodate the
maintenance work. The maintenance work involves cleaning and painting
of the swing span. This work is essential for the continued operation
of the draw span.
This deviation allows the draw of the SR 57 swing span bridge
across Dulac Bayou, mile 0.6, at Dulac to remain in the closed-to-
navigation position between 7 a.m. and noon and from 12:30 p.m. until
3:30 p.m., on July 6, 7, 8, 13, 14, 15, 20, 21, 22, 27, 28 and 29,
1998. The span will open for the passage of traffic from noon until
12:30 on each of these days. The bridge will operate normally at all
other times.
This deviation will be effective from 7 a.m. on July 6 until 3:30
p.m. on July 29, 1998. Presently, the draw opens on signal at any time.
Dated: June 11, 1998.
A.L. Gerfin, Jr.,
Captain, U.S. Coast Guard, Acting Commander, 8th Coast Guard Dist.
[FR Doc. 98-16368 Filed 6-18-98; 8:45 am]
BILLING CODE 4910-15-M
Browse by Year
/ 1998
/ June
/ Friday, June 19, 1998
Credit Cards - Arizona Pools - Loans - Guitar Books
|
|