Browse by Year
/ 2002
/ June
/ Friday, June 21, 2002
[Federal Register: June 21, 2002 (Volume 67, Number 120)]
[Notices]
[Page 42253-42254]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr21jn02-61]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6630-5]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
[[Page 42254]]
Review Process (ERP), under section 309 of the Clean Air Act and
section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at (202) 564-7167. An explanation of the ratings
assigned to draft environmental impact statements (EISs) was published
in FR dated April 12, 2002, (67 FR 11992).
Draft EISs
ERP No. D-DOE-L05224-WA Rating LO, Maiden Wind Farm Project,
Proposes to Construct and Operate up to 494 megawatts (MW) Wind
Generation on Privately- and Publicly-owned Property, Conditional Use
Permits, Benton and Yakima Counties, WA.
Summary: EPA has no significant concerns with the project.
ERP No. D-FHW-F40404-MN Rating EO2, Trunk Highway (TH) 53 Project,
Transportation Improvements, from 1.2 km (\3/4\ mile) South of St.
Louis County Road 307 to the South City Limits of Cook, NPDES Permit,
COE Section 10 and 404 Permits, St. Louis County, MN.
Summary: EPA expressed environmental objections regarding the
magnitude of wetland impacts, lack of a detailed wetland mitigation
plan, impacts to U.S. Forest Service land, and possible forest
fragmentation and wildlife habitat issues. EPA requested that
additional information on wetland mitigation, forest fragmentation and
wildlife habitat impacts be developed and taken into consideration when
identifying a preferred alternative.
ERP No. D-FHW-H40403-KS Rating EC2, US 59 Highway Construction
Improvements, Lawrence to Ottawa, Funding, NPDES Permit Issuance and
Possible US Army COE Permit Issuance, Douglas and Franklin Counties,
KS.
Summary: EPA expressed environmental concerns with the degree of
information provided on cultural resources, noise impacts, and
endangered species. EPA requested that appropriate mitigation measures
be described in more detail for these three project impacts.
ERP No. D-NPS-D65025-WV Rating LO, National Coal Heritage Area,
Strategic Management Action Plan, Implementation, Boone, Cabal,
Layette, Logan, McDowell, Mercer, Mingo, Raleigh, Summers, Wayne and
Wyoming Counties, WV.
Summary: EPA expressed lack of objections to the preferred
alternative.
Final EISs
ERP No. F-AFS-F65029-IL Midewin National Tallgrass, Proposed Land
and Resource Management Plan, Implementation, Prairie Plan Development,
Will County, IL.
Summary: EPA has no objection to the action as proposed since the
final EIS addressed previous concerns regarding water quality,
preserving wetland functions, invasive species, and non-target
agricultural practice impacts.
ERP No. F-BLM-K67052-NV Newmont Gold Mining, South Operations Area
Project Amendment, Operation and Expansion, Plan of Operations, Elko
and Eureka Counties, NV.
Summary: EPA expressed continuing objections to the proposed
project because the existing mine is currently out of compliance with
its National Pollutant Discharge Elimination System (NPDES) discharge
effluent limitations for total dissolved solids (TDS) and possibly
other constituents. EPA recommended that BLM not approve the Plan of
Operations for the proposed expansion until the mine comes into
compliance with its permit. EPA also expressed concerns regarding the
acid generating potential of the waste rock, and recommended that BLM
include specific commitments in its Record of Decision (ROD) to ensure
the appropriate ratio of acid neutralizing waste rock to acid
generating waste rock during disposal. EPA recommended that BLM
consider additional monitoring and address any long-term bonding needs
prior to issuance of the Plan of Operations.
ERP No. F-MMS-L03010-AK Liberty Development and Production Plan,
Beaufort Sea Oil and Gas Development, Implementation, To Transport and
Sell Oil to the U.S. and World Markets, Right-of-Way Application,
Offshore Beaufort Sea Marine Environment and Onshore North Slope of
Alaska Coastal Plan, AK.
Summary: No formal comment letter was sent to the preparing agency.
ERP No. F-USA-D11032-PA Fort Indiantown Gap National Guard Training
Center, Training and Operations Enhancement, Pennsylvania National
Guard (PANG), Annville, Dauphin and Lebanon Counties, PA.
Summary: EPA has no objection to the proposed action since previous
issues were adequately addressed within the Final EIS.
Dated: June 18, 2002.
B. Katherine Biggs,
Associate Director, NEPA Compliance Division, Office of Federal
Activities.
[FR Doc. 02-15727 Filed 6-20-02; 8:45 am]
BILLING CODE 6560-50-P
Browse by Year
/ 2002
/ June
/ Friday, June 21, 2002
Credit Cards
|
|