Browse by Year
/ 2002
/ June
/ Wednesday, June 05, 2002
[Federal Register: June 5, 2002 (Volume 67, Number 108)]
[Notices]
[Page 38649]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr05jn02-36]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Department of the Army
Final Environmental Impact Statement (FEIS) for Enhanced Training
and Operations at the National Guard Training Center (NGTC)--Fort
Indiantown Gap (FTIG), PA
AGENCY: National Guard Bureau (NGB), Department of the Army, DoD.
ACTION: Notice of availability.
-----------------------------------------------------------------------
SUMMARY: The Pennsylvania Army National Guard (PAARNG) and the
Pennsylvania Air National Guard (PAANG) have formulated long-range
plans to ensure the continued and long-term viability of FTIG as a
National Guard Training Center. The proposed plan, a total of 11
actions comprised of 42 component projects, is proposed for the
specific purposes and needs set forth in the FEIS. These proposed
actions consist of the construction or improvement of the following
projects: (1) Tracked Vehicle Training Complex, (2) Ammunition Supply
Point Facility, (3) Artillery Training Support Facility, (4) Multi-
Purpose Training Range Facility, (5) NGTC-FTIG Garrison Facility, (6)
Wastewater Treatment Plant and Collection System, (7) Muir Army
Airfield Complex, (8) Air Guard Station Facilities, (9) Air-to-Ground
Range Control Compound, (10) Regional Equipment Operator Training
School, and (11) the implementation of the Integrated Natural Resources
Management Plan. Each of the proposed actions have been determined to
be necessary to allow the PAARNG and PAANG to continue to utilize the
training site to support on-going military and civilian missions. By
implementing each of these actions, NGTC-FTIG will continue to provide
training and support facilities necessary to ensure its long-term
viability, sustainability, and value as a major NGB training site.
DATES: The review period for the FEIS will end 30 days after
publication of the NOA in the Federal Register by the U.S.
Environmental Protection Agency.
ADDRESSES: Written comments or materials should be forwarded to Captain
Geoffrey Lincoln, NGTC-FTIG EIS Project Officer, NGTC-FTIG,
Environmental Section, 1119 Utility Road, Annville, Pennsylvania 17003-
5002 or Lieutenant Colonel Christopher Cleaver, NGTC-FTIG Public
Affairs Officer (PAO), PADMVA Headquarters, Building 0-47, Annville,
Pennsylvania 17003-5002.
FOR FURTHER INFORMATION CONTACT: Captain Lincoln at (717) 861-2548 or
Lieutenant Colonel Cleaver at (717) 861-8468.
SUPPLEMENTARY INFORMATION: The mission of the 28th Infantry Division
(Mechanized) is to be trained and equipped to join the active forces in
time of war or national emergency to respond to orders of the Governor,
to protect lives and property during natural and man-made disasters, to
clean up the environment, to fight to eradicate the illicit flow of
drugs, and to serve as role models for future generations. Each of the
proposed actions is necessary to allow the PAARNG and PAANG to
productively utilize FTIG to support its on-going military and civilian
missions.
Two alternatives in addition to the proposed action were
considered: (1) Alternative 2 includes a scaled down or modified
version of some or all of the proposed projects. This alternative
primarily changes the scope of the Tracked Vehicle Training Complex,
Multi-Purpose Training Range Facility, and Muir Military Runway/
Enhancement proposed actions. The three alternative projects, coupled
with the other eight actions as proposed in the EIS, comprise
Alternative 2 and (2) Alternative 3, whereby none of the proposed
upgrade or facility construction actions would be implemented; on-going
actions will be continue; no new construction projects would be
authorized except those already under construction or contracted for
construction.
By implementing the proposed actions, NGTC-FTIG can continue to
provide training and support facilities necessary to ensure its long-
term viability, sustainability and value as a major NGB training site.
A summary of impact analyses of previously completed Environmental
Assessments is incorporated into the FEIS.
Dated: May 29, 2002.
Raymond J. Fatz,
Deputy Assistant Secretary of the Army (Environment, Safety and
Occupational Health), OASA (I&E).
[FR Doc. 02-14070 Filed 6-4-02; 8:45 am]
BILLING CODE 3710-08-M
Browse by Year
/ 2002
/ June
/ Wednesday, June 05, 2002
Bankruptcy Certification - Credit Cards - Arizona Landscaping - Guitar Books
|
|