DEPARTMENT OF TRANSPORTATION
Federal Highway Administration
Final Federal Agency Actions on Proposed Highway in North
Carolina
AGENCY: Federal Highway Administration (FHWA), DOT.
ACTION: Notice of Limitation on Claims for Judicial Review of Actions
by Army Corps of Engineers (USACE), DoD, and Other Federal Agencies.
-----------------------------------------------------------------------
SUMMARY: This notice announces actions taken by the USACE and other
Federal agencies that are final within the meaning of 23 U.S.C.
139(I)(1). The actions relate to a proposed highway project, the
Western Wake Freeway, which begins at NC 55 at Old Smithfield Road (SR
1172) between Apex and Holly Springs and ends at NC 55 near Alston
Avenue north of Cary in the County of Wake, State of North Carolina.
The Western Wake Freeway is also known as State Transportation
Improvement Program Project R-2635. It is part of the Outer Wake
Expressway, a circumferential freeway around Raleigh, North Carolina.
Those actions
[[Page 27013]]
grant licenses, permits, and approvals for the project.
DATES: By this notice, the FHWA is advising the public of final agency
actions subject to 23 U.S.C. 139(I)(1). A claim seeking judicial review
of the Federal agency actions that are covered by this notice will be
barred unless the claim is filed on or before November 10, 2008. If the
Federal law that authorizes judicial review of a claim provides a time
period of less than 180 days for filing such claim, then that shorter
time period still applies.
FOR FURTHER INFORMATION CONTACT: Mr. George Hoops, P.E., Major Projects
Engineer, Federal Highway Administration, 310 New Bern Avenue, Suite
410, Raleigh, North Carolina, 27601, Telephone: (919) 747-7022; e-mail:
george.hoops@fhwa.dot.gov. (Regular business hours are 8 a.m. to 5
p.m.). Ms. Jennifer Harris, P.E., Staff Engineer, North Carolina
Turnpike Authority, 5400 Glenwood Avenue, Suite 400, Raleigh, North
Carolina, 27612, Telephone: (919) 571-3004; e-mail:
jennifer.harris@ncturnpike.org. (Regular business hours are 8 a.m. to
e-mail 5 p.m.). Mr. Eric Alsmeyer, Project Manager, U.S. Army Corps of
Engineers, Raleigh Regulatory Field Office, 3331 Heritage Trade Drive,
Suite 105, Wake Forest, North Carolina, 27587, Telephone: (919) 554-
4884, extension 23; e-mail: Eric.C.Alsmeyer@usace.army.mil. (Regular
business hours are 8 a.m. to 5 p.m.).
SUPPLEMENTARY INFORMATION: On September 27, 2007, the FHWA published a
``Notice of Final Federal Agency Actions on Proposed Highway in North
Carolina'' in the Federal Register in Volume 72, Number 187 for the
following highway project: The Western Wake Freeway, a 12.6-mile long,
6-lane, fully access-controlled, new location roadway located in Wake
County, North Carolina. The purpose of the project is to provide a high
speed, multi-lane, controlled-access facility to accommodate the
increasing transportation demand in the western Wake County area. The
project is known as Federal Project Number BRSTP-000S(491). The actions
by the Federal agencies, and the laws under which such actions were
taken, are described in the Final Environmental Impact Statement (FEIS)
for the project, approved on January 21, 2004, in the FHWA Record of
Decision (ROD) issued on April 30, 2004 approving the Western Wake
Freeway project, and in a Reevaluation Report for Administrative Action
issued on September 7, 2007 (``Reevaluation Report''), determining that
a supplemental environmental impact statement is not required, and in
other documents in the FHWA administrative record. Notice is hereby
given that, subsequent to the earlier FHWA notice, the USACE has taken
final agency actions within the meaning of 23 U.S.C. 139(I)(1) by
issuing permits and approvals for the highway project. The actions by
the USACE, related final actions by other Federal agencies, and the
laws under which such actions were taken, are described in the USACE
decisions and its administrative record for the project, referenced as
Department of the Army Permit Number 2007-02903. That information is
available by contacting the USACE at the address provided above.
Information about the project also is available from the FHWA and
the North Carolina Turnpike Authority at the addresses provided above.
The FHWA FEIS, ROD and Reevaluation Report can be viewed at the North
Carolina Turnpike Authority offices. The USACE decision can be viewed
and downloaded from the project Web site at http://www.ncturnpike.org/
pdf/STIPR-2635404Permit.pdf. This notice applies to all USACE and other
Federal agency final actions taken after the issuance date of the FHWA
Federal Register notice described above. The laws under which actions
were taken include, but are not limited to:
1. General: National Environmental Policy Act (NEPA) [42 U.S.C.
4321-4351]; Federal-Aid Highway Act [23 U.S.C. 109].
2. Air: Clean Air Act [42 U.S.C. 7401-7671(q)].
3. Land: Section 4(f) of the Department of Transportation Act of
1966 [49 U.S.C. 303]; Landscaping and Scenic Enhancement (Wildflowers)
[23 U.S.C. 319].
4. Wildlife: Endangered Species Act [16 U.S.C. 1531-1544 and
Section 1536], Marine Mammal Protection Act [16 U.S.C. 1361],
Anadromous Fish Conservation Act [16 U.S.C. 757(a)-757(g)], Fish and
Wildlife Coordination Act [16 U.S.C. 661-667(d)], Migratory Bird Treaty
Act [16 U.S.C. 703-712], Magnuson-Stevenson Fishery Conservation and
Management Act of 1976, as amended [16 U.S.C. 1801 et seq.].
5. Historic and Cultural Resources: Section 106 of the National
Historic Preservation Act of 1966, as amended [16 U.S.C. 470(f) et
seq.]; Archeological Resources Protection Act of 1977 [16 U.S.C.
470(aa)-11]; Archeological and Historic Preservation Act [16 U.S.C.
469-469(c)]; Native American Grave Protection and Repatriation Act
(NAGPRA) [25 U.S.C. 3001-3013].
6. Social and Economic: Civil Rights Act of 1964 [42 U.S.C.
2000(d)-2000(d)(1)]; American Indian Religious Freedom Act [42 U.S.C.
1996]; Farmland Protection Policy Act (FPPA) [7 U.S.C. 4201-4209].
7. Wetlands and Water Resources: Land and Water Conservation Fund
(LWCF) [16 U.S.C. 4601-4604]; Safe Drinking Water Act (SDWA) [42 U.S.C.
300(f)-300(j)(6)]; Wild and Scenic Rivers Act [16 U.S.C. 1271-1287);
Emergency Wetlands Resources Act [16 U.S.C. 3921, 3931]; TEA-21
Wetlands Mitigation [23 U.S.C. 103(b)(6)(m), 133(b)(11)]; Flood
Disaster Protection Act [42 U.S.C. 4001-4128].
8. Hazardous Materials: Comprehensive Environmental Response,
Compensation, and Liability Act (CERCLA) [42 U.S.C. 9601-9675];
Superfund Amendments and Reauthorization Act of 1986 (SARA); Resource
Conservation and Recovery Act (RCRA) [42 U.S.C. 6901-6992(k)].
9. Executive Orders: E.O. 11990 Protection of Wetlands; E.O. 11988
Floodplain Management; E.O. 12898, Federal Actions to Address
Environmental Justice in Minority Populations and Low Income
Populations; E.O. 11593 Protection and Enhancement of Cultural
Resources; E.O. 13007 Indian Sacred Sites; E.O. 13287 Preserve America;
E.O. 13175 Consultation and Coordination with Indian Tribal
Governments; E.O. 11514 Protection and Enhancement of Environmental
Quality; E.O. 13112 Invasive Species.
(Catalog of Federal Domestic Assistance Program Number 20.205,
Highway Planning and Construction. The regulations implementing
Executive Order 12372 regarding intergovernmental consultation on
Federal programs and activities apply to this program.)
Authority: 23 U.S.C. 139(I)(1).
Issued on: May 5, 2008.
George Hoops,
Major Projects Engineer, Raleigh, North Carolina.
[FR Doc. E8-10465 Filed 5-9-08; 8:45 am]
BILLING CODE 4910-RY-P