Browse by Year
/ 2008
/ May
/ Wednesday, May 14, 2008
[Federal Register: May 14, 2008 (Volume 73, Number 94)]
[Rules and Regulations]
[Page 27744]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr14my08-9]
[[Page 27744]]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[USCG-2008-0258]
Drawbridge Operation Regulations; Charles River, Boston, MA,
Larry Kessler 5K Run
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, First Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
Craigie Bridge across the Charles River at mile 1.0, at Boston,
Massachusetts. Under this temporary deviation the bridge may remain in
the closed position for one hour during a public event, the 2008 Larry
Kessler 5K Run. This deviation is necessary to facilitate public safety
during a public event.
DATES: This deviation is effective from 10:45 a.m. through 11:45 a.m.,
on June 1, 2008.
ADDRESSES: Documents indicated in this preamble as being available in
the docket are part of docket USCG-2008-0258 and are available online
at http:// www.regulations.gov. They are also available for inspection
or copying at two locations: the Docket Management Facility (M-30),
U.S. Department of Transportation, West Building Ground Floor, Room
W12-140, 1200 New Jersey Avenue, SE., Washington, DC 20590, between 9
a.m. and 5 p.m., Monday through Friday, except Federal holidays, and
the First Coast Guard District, Bridge Branch Office, 408 Atlantic
Avenue, Boston, Massachusetts 02110, between 7 a.m. and 3 p.m., Monday
through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: John McDonald, Project Officer, First
Coast Guard District, at (617) 223-8364.
SUPPLEMENTARY INFORMATION: The Craigie Bridge, across the Charles River
at mile 1.0, at Boston, Massachusetts, has a vertical clearance in the
closed position of 13.5 feet at normal pool elevation above the Charles
River Dam. The existing drawbridge operation regulation is listed at 33
CFR 117.591(e).
The waterway is predominantly a recreational waterway supporting
various size vessels. The facilities were notified regarding this
closure and no objections were received.
The owner of the bridge, the Department of Conservation and
Recreation (DCR), requested a temporary deviation to facilitate public
safety during a public event, the 2008 Larry Kessler 5K Run.
Under this temporary deviation, in effect from 10:45 a.m. through
11:45 a.m. on June 1, 2008, the Craigie Bridge at mile 1.0, across the
Charles River at Boston, Massachusetts, may remain in the closed
position.
Vessels that can pass under the bridge without a bridge opening may
do so at all times.
In accordance with 33 CFR 117.35(e), the bridge must return to its
regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: May 6, 2008.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. E8-10709 Filed 5-13-08; 8:45 am]
BILLING CODE 4910-15-P
Browse by Year
/ 2008
/ May
/ Wednesday, May 14, 2008
Remortgages - Loans - Wills - Credit Card Consolidation
|
|