Browse by Year
/ 2008
/ May
/ Thursday, May 08, 2008
[Federal Register: May 8, 2008 (Volume 73, Number 90)]
[Rules and Regulations]
[Page 25977-25984]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr08my08-6]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA-2007-28385; Directorate Identifier 2006-NM-181-AD;
Amendment 39-15513; AD 2008-10-07]
RIN 2120-AA64
Airworthiness Directives; Boeing Model 747-100, 747-100B, 747-
100B SUD, 747-200B, 747-200C, 747-200F, 747-300, 747SR, and 747SP
Series Airplanes
AGENCY: Federal Aviation Administration (FAA), DOT.
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: We are adopting a new airworthiness directive (AD) for all
Boeing Model 747-100, 747-100B, 747-100B SUD, 747-200B, 747-200C, 747-
200F, 747-300, 747SR, and 747SP series airplanes. This AD requires
revising the FAA-approved maintenance program by incorporating new
airworthiness limitations (AWLs) for fuel tank systems to satisfy
Special Federal Aviation Regulation No. 88 requirements. This AD also
requires the initial inspection of
[[Page 25978]]
certain repetitive AWL inspections to phase in those inspections, and
repair if necessary. This AD results from a design review of the fuel
tank systems. We are issuing this AD to prevent the potential for
ignition sources inside fuel tanks caused by latent failures,
alterations, repairs, or maintenance actions, which, in combination
with flammable fuel vapors, could result in a fuel tank explosion and
consequent loss of the airplane.
DATES: This AD is effective June 12, 2008.
The Director of the Federal Register approved the incorporation by
reference of a certain publication listed in this AD as of June 12,
2008.
ADDRESSES: For service information identified in this AD, contact
Boeing Commercial Airplanes, P.O. Box 3707, Seattle, Washington 98124-
2207.
Examining the AD Docket
You may examine the AD docket on the Internet at http://
www.regulations.gov; or in person at the Docket Management Facility
between 9 a.m. and 5 p.m., Monday through Friday, except Federal
holidays. The AD docket contains this AD, the regulatory evaluation,
any comments received, and other information. The address for the
Docket Office (telephone 800-647-5527) is the Document Management
Facility, U.S. Department of Transportation, Docket Operations, M-30,
West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue, SE.,
Washington, DC 20590.
FOR FURTHER INFORMATION CONTACT: Sulmo Mariano, Aerospace Engineer,
Propulsion Branch, ANM-140S, FAA, Seattle Aircraft Certification
Office, 1601 Lind Avenue, SW., Renton, Washington 98057-3356; telephone
(425) 917-6501; fax (425) 917-6590.
SUPPLEMENTARY INFORMATION:
Discussion
We issued a notice of proposed rulemaking (NPRM) to amend 14 CFR
part 39 to include an airworthiness directive (AD) that would apply to
all Boeing Model 747-100, 747-100B, 747-100B SUD, 747-200B, 747-200C,
747-200F, 747-300, 747SR, and 747SP series airplanes. That NPRM was
published in the Federal Register on July 3, 2007 (72 FR 36380). That
NPRM proposed to require revising the FAA-approved maintenance program
by incorporating new airworthiness limitations (AWLs) for fuel tank
systems to satisfy Special Federal Aviation Regulation No. 88
requirements. That NPRM also proposed to require the initial inspection
of certain repetitive AWL inspections to phase in those inspections,
and repair if necessary.
Actions Since NPRM Was Issued
Since we issued the NPRM, Boeing has issued the Boeing 747-100/200/
300/SP Airworthiness Limitations (AWLs) and Certification Maintenance
Requirements (CMRs), D6-13747-CMR, Revision March 2008 (hereafter
referred to as ``Revision March 2008 of Document D6-13747-CMR''). (For
the purposes of Revision March 2008 of Document D6-13747-CMR, the Model
747SR series airplane is basically a Model 747-100 series airplane with
certain modifications to improve fatigue life.) The NPRM referred to
Revision March 2006 of Document D6-13747-CMR as the appropriate source
of service information for accomplishing the proposed actions. Revision
March 2008 of Document D6-13747-CMR includes the following changes:
Removes the repetitive task interval of 36,000 flight
hours from AWLs No. 28-AWL-01, No. 28-AWL-03, and No. 28-AWL-13.
Revises AWL No. 28-AWL-03 to reflect the new maximum loop
resistance values associated with the lightning protection of the
unpressurized fuel quantity indicating system (FQIS) wire bundle
installations, and removes the joint resistance values.
Revises AWL No. 28-AWL-06 to correct the numerical value
given in milliohms for the bonding measurement.
We have revised paragraphs (f), (g), and (h) of this AD to refer to
Revision March 2008 of Document D6-13747-CMR. We also have removed
reference to 36,000 total flight cycles from Table 1 of this AD and
revised the initial threshold for accomplishing AWLs No. 28-AWL-01, No.
28-AWL-03, and No. 28-AWL-13 to within 144 months since the date of
issuance of the original standard airworthiness certificate or the date
of issuance of the original export certificate of airworthiness. (The
NPRM incorrectly specified 36,000 total ``flight cycles'' instead of
``flight hours.'')
We also have added a new paragraph (j) to this AD specifying that
actions done before the effective date of this AD in accordance with
Revisions March 2006 through January 2008 of Document D6-13747-CMR are
acceptable for compliance with the corresponding requirements of
paragraphs (g) and (h) of this AD.
Operators should note that we have revised paragraph (g) of this AD
to require incorporating only AWLs No. 28-AWL-01 through No. 28-AWL-19
inclusive. AWLs No. 28-AWL-20, No. 28-AWL-21, and No. 28-AWL-22 were
added in Revision January 2007 of Document D6-13747-CMR, and AWL No.
28-AWL-23 was added in Revision September 2007 of Document D6-13747-
CMR. We issued a separate NPRM that proposes to incorporate AWL No. 28-
AWL-20 into the FAA-approved maintenance program. That NPRM (Docket No.
FAA-2008-0091) was published in the Federal Register on January 31,
2008 (73 FR 5770). We also issued a separate NPRM (Docket No. FAA-2008-
0090) that proposes to incorporate AWL No. 28-AWL-21 into the FAA-
approved maintenance program. That NPRM was published in the Federal
Register on January 31, 2008 (73 FR 5773). We might issue additional
rulemaking to require the incorporation of AWLs No. 28-AWL-22 and No.
28-AWL-23. However, as an optional action, operators may incorporate
those AWLs as specified in paragraph (g) of this AD.
Other Changes Made to This AD
We have revised paragraph (h) of this AD to clarify that the
actions identified in Table 1 of this AD must be done at the compliance
time specified in that table. Also, for standardization purposes, we
have revised this AD in the following ways:
We have added a new paragraph (i) to this AD to specify
that no alternative inspections, inspection intervals, or critical
design configuration control limitations (CDCCLs) may be used unless
they are part of a later approved revision of Revision March 2008 of
Document D6-13747-CMR, or unless they are approved as an alternative
method of compliance (AMOC). Inclusion of this paragraph in the AD is
intended to ensure that the AD-mandated airworthiness limitations
changes are treated the same as the airworthiness limitations issued
with the original type certificate.
We have revised Note 1 of this AD to clarify that an
operator must request approval for an AMOC if the operator cannot
accomplish the required inspections because an airplane has been
previously modified, altered, or repaired in the areas addressed by the
required inspections.
Comments
We gave the public the opportunity to participate in developing
this AD. We considered the comments received from the six commenters.
Request To Allow Inspections Done According to a Maintenance Program
Japan Airlines (JAL) requests that we revise paragraph (h) of the
NPRM to allow an operator to update its FAA-
[[Page 25979]]
approved maintenance program to include the initial inspections and
repair for certain AWLs. JAL states that the NPRM would require
accomplishing the initial inspection and repair of certain AWLs, which
would require JAL to establish a special inspection and special
recordkeeping for the proposed requirement.
The compliance times specified in paragraph (h) of this AD are
intended to provide a grace period for those airplanes that have
already exceeded the specified threshold in Document D6-13747-CMR. To
be in compliance with the recording requirements of this AD, operators
must record their compliance with the initial inspection for those
airplanes over the specified threshold. We have revised paragraph (h)
of this AD to specify that accomplishing the applicable AWLs as part of
an FAA-approved maintenance program before the applicable compliance
time constitutes compliance with the applicable requirements of that
paragraph.
Request To Revise Intervals for Certain AWL Inspections
KLM Royal Dutch Airlines (KLM), on behalf of several operators,
requests that we review a 45-page proposal to align certain
airworthiness limitation item (ALI) intervals with the applicable
maintenance significant item (MSI) and enhanced zonal analysis
procedure (EZAP) intervals for Model 737, 747, 757, 767, and 777
airplanes. The recommendations in that proposal ensure that the ALI
intervals align with the maintenance schedules of the operators. Among
other changes, the proposal recommends revising certain AWL inspection
intervals from 12 years/36,000 flight hours to only 12 years for Model
747-100, 747-100B, 747-100B SUD, 747-200B, 747-200C, 747-200F, 747-300,
747SR, and 747SP series airplanes.
Qantas Airways also requests that the 36,000-flight-hour parameter
be removed from the inspection interval for AWL No. 28-AWL-01, No. 28-
AWL-03, and No. 28-AWL-13. The commenter states that the flight-hour
parameter does not adequately take into account actual airplane usage,
and that the long haul utilization of the airplane is 5,000 flight
hours per year. Based on this number, the commenter states that the AWL
tasks would be required at 7.2 years instead of 12 years.
Qantas Airways and TradeWinds Airlines both note an inconsistency
between the inspection interval specified in Revision March 2006 of
Document D6-13747-CMR and the compliance threshold specified in Table 1
of the NPRM. Table 1 of the NPRM specifies accomplishing the initial
inspection within 36,000 total flight cycles or 144 months since the
date of issuance of the original standard airworthiness certificate or
the date of issuance of the original export certificate of
airworthiness, whichever occurs first. TradeWinds Airlines requests
that we revise the compliance threshold to 36,000 ``total flight
hours.'' However, Qantas Airways would welcome the change from ``flight
hours'' to ``flight cycles,'' if the flight-hour parameter is not
deleted from the inspection intervals specified in Revision March 2006
of Document D6-13747-CMR.
We have reviewed the commenter's requests, and we agree to revise
the compliance threshold for certain AWLs identified by KLM and Qantas
Airways. As stated previously, Revision March 2008 of Document D6-
13747-CMR specifies a repetitive interval of 144 months. We have
revised the threshold specified in Table 1 of this AD accordingly.
Request To Harmonize Task Descriptions
JAL states that, in Revision March 2006 of Document D6-13747-CMR,
the task descriptions defining the applicable area are different for
AWLs Nos. 28-AWL-01 and 28-AWL-02. (AWL No. 28-AWL-01 is a repetitive
inspection of the external wires over the center fuel tank, and AWL No.
28-AWL-02 is a CDCCL to maintain the original design features for the
external wires over the center fuel tank.) JAL believes that the task
descriptions for these AWLs should match. JAL presumes that, if one
purpose for the inspection is to prevent a spark in the fuel vapor over
the center fuel tank, then the applicable area should have a certain
tolerance instead of defining the area by exact station number.
We agree that the task descriptions for AWL Nos. 28-AWL-01 and 28-
AWL-02 should be harmonized. Revision March 2008 of Document D6-13747-
CMR includes a revised task description of AWL No. 28-AWL-01, which
addresses JAL's comments. As stated previously, we have revised this AD
to refer to Revision March 2008 of Document D6-13747-CMR.
Request To Revise the Loop Resistance Values for AWL No. 28-AWL-03
Boeing, KLM, and Qantas Airways state that the loop resistance
values for AWL No. 28-AWL-03 specified in Revision March 2006 of
Document D6-13747-CMR are going to be revised, since those values are
relevant for production airplanes. The commenters also state that the
revised values will be more representative of the expected values for
in-service airplanes. Boeing points out that, according to paragraph
(h) of the NPRM, the revised values should be able to be used in
accordance with a later revision of Revision March 2006 of Document D6-
13747-CMR if the revision is approved by the Seattle Aircraft
Certification Office (ACO), FAA.
We agree that operators may use the revised loop resistance values
for AWL No. 28-AWL-03 in accordance with Revision March 2008 of
Document D6-13747-CMR. As stated previously, we have revised this AD
accordingly.
Request To Clarify Use of Equivalent Tools and Chemicals
JAL requests that we provide guidelines for using equivalent tools
and chemical materials according to the component maintenance manuals
(CMMs). JAL states that normally operators can use equivalents without
FAA approval when the CMM specifies that equivalents may be used. JAL
also states that it has received further clarification from Boeing
specifying that unless a CDCCL refers to a certain tool by part number
or certain chemicals by name, an operator can continue to use
equivalent tools or materials according to the CMMs.
We acknowledge the commenter's request and are working with Boeing
to provide appropriate flexibility while still ensuring that items
critical for maintaining safety continue to be specifically identified
in the CMMs. However, to delay issuance of this AD would be
inappropriate.
We agree that when the CMMs allow use of equivalent tools or
chemical materials, operators and repair stations may use equivalents.
We have already approved the use of the CMMs at the revision levels
specified in Revision March 2008 of Document D6-13747-CMR, including
the use of equivalent tools or chemicals where the CMMs state
equivalents are allowed. If the CMM does not allow use of an
equivalent, none may be used. No change to this AD is necessary in this
regard.
Request To Revise Appendix 1
Boeing requests that we revise Appendix 1 of the NPRM as follows:
(1) Correct the ATA section for AWL No. 28-AWL-03, (2) add an airplane
maintenance manual (AMM) task title for AWL No. 28-AWL-08, and (3) add
an ATA section for AWL No. 28-AWL-18.
[[Page 25980]]
JAL requests that we update Appendix 1 of the NPRM to include all
AWLs specified in the CMR, and that we indicate how to maintain the
latest version of Appendix 1. JAL also requests that we correct the
following error in Appendix 1 of the NPRM: For AWL No. 28-AWL-04,
change ``SWPM 20-10-15'' to ``SWPM 20-10-13.''
We disagree with revising the AMM references, since we have deleted
Appendix 1 from this AD. The purpose of Appendix 1 was to assist
operators in identifying the AMM tasks that could affect compliance
with a CDCCL. However, we have also received several similar comments
regarding the appendices in other NPRMs that address the same unsafe
condition on other Boeing airplanes. Those comments indicate that
including non-required information in those NPRMs has caused confusion.
Further, Revision March 2008 of Document D6-13747-CMR contains most of
the updated information that is listed in Appendix 1 of the NPRM.
Therefore, we have removed Appendix 1 from this AD.
Request To Revise Note 1
Boeing requests that we revise Note 1 of the NPRM to clarify the
need for an AMOC. Boeing states that the current wording is difficult
to follow, and that the note is meant to inform operators that an AMOC
to the required AWLs might be required if an operator has previously
modified, altered, or repaired the areas addressed by the limitations.
Boeing requests that we revise Note 1 as follows:
Add the words ``according to paragraph (g)'' at the end of
the first sentence.
Replace the words ``revision to'' with ``deviation from''
in the last sentence.
Delete the words ``(g) or'' and ``as applicable'' from the
last sentence.
As stated previously, we have clarified the language in Note 1 of
this AD for standardization with other similar ADs. The language the
commenter requests that we change does not appear in the revised note.
Therefore, no additional change to this AD is necessary in this regard.
Request To Extend the Grace Period for AWL No. 28-AWL-03
KLM expects to have problems accomplishing the initial inspection
of AWL No. 28-AWL-03 within the 24-month grace period. KLM states that
if it does the check and does not reach the specified values, then tank
entry outside of heavy maintenance would be necessary. KLM also states
that it would be helpful to plan to do this inspection during an
overhaul.
We infer that KLM requests that we extend the grace period for AWL
No. 28-AWL-03 in Table 1 of this AD to allow accomplishing the initial
inspection during a regularly scheduled ``D'' check (about 6 years). We
disagree with extending the grace period to 6 years. In developing an
appropriate compliance time for this action, we considered the safety
implications, the rate of lightning strikes in the fleet, and the
average age of the fleet. In consideration of these items, we have
determined that an initial compliance time of 144 months (as discussed
previously) with a grace period of 24 months will ensure an acceptable
level of safety. We have not changed the grace period for AWL No. 28-
AWL-03 in this regard.
Request To Extend the Exceptional Short-Term Extension
Qantas Airways requests that we allow exceptional short-term
extensions of 10 percent of the task interval or 6 months, whichever is
less, for AWL tasks. The commenter believes that the exceptional short-
term extension of 30 days, which is specified in Revision March 2006 of
Document D6-13747-CMR, is too small for AWL tasks having 12-year
intervals. The commenter states that, as part of the Boeing 747
Corrosion Prevention and Control Program mandated by AD 90-25-05,
amendment 39-6790 (55 FR 49268, November 27, 1990), operators were
given a provision to invoke exceptional short-term extensions of 10
percent of the task interval or 6 months, whichever is less. The
commenter states that this is a more appropriate magnitude because
operators are often permitted one-time exceptional extensions to
maintenance checks and tasks of this proportion. The commenter also
states that limiting the extension period to 30 days means that a ``D''
check can never be extended by more than 30 days, which would force
operators to do certain AWL inspections outside of a ``D'' check.
We disagree with the commenter's request because exceptional short-
term extensions are, in essence, pre-approved extensions without
Seattle ACO review of the specifics of the situation. We consider that
the ability to extend the interval without further approval for 30 days
should be sufficient for most circumstances. However, if an operator
finds that it needs an extension longer than 30 days, with appropriate
justification one may be requested from the Seattle ACO, or governing
regulatory authority. Longer extensions may be granted on a case-by-
case basis because, as Qantas Airways points out, the task interval is
long, and the FAA is interested in limiting out-of-sequence work. We
have not changed this AD in this regard.
Request To Require Latest Revision of the AMM
JAL requests that we revise the NPRM to require incorporation of
the latest revision of the manufacturer's AMM. JAL asserts that we have
allowed Boeing to include statements in the Boeing AMM allowing
operators to use certain CMM revision levels or later revisions. JAL
states that, with the exception of the CMM, operators cannot find what
revision level of the AMM needs to be incorporated into the operator's
AMM in order to comply with the proposed requirements of the NPRM. JAL
also states that it could take several weeks to incorporate the
manufacturer's AMM.
JAL further requests that we clarify whether it is acceptable to
change the procedures in the AMM with Boeing's acceptance. JAL states
that the CMR notes that any use of parts, methods, techniques, or
practices not contained in the applicable CDCCL and AWL inspection must
be approved by the FAA office that is responsible for the airplane
model type certificate, or applicable regulatory agency. JAL also
states that the Boeing AMM or CMM notes to obey the manufacturer's
procedures when doing maintenance that affects a CDCCL or AWL
inspection. However, JAL believes that according to the NPRM it is
acceptable to change the AMM procedures with Boeing's acceptance.
We disagree with the changes proposed by the commenter. This AD
does not require revising the AMM. This AD does require revising your
maintenance program to incorporate the AWLs identified in Revision
March 2008 of Document D6-13747-CMR. However, complying with the AWL
inspections or CDCCLs will require other actions by operators including
AMM revisions. In the U.S., operators are not required to use original
equipment manufacturer (OEM) maintenance manuals. Operators may develop
their own manuals, which are reviewed and accepted by the FAA Flight
Standards Service. In order to maintain that flexibility for operators,
most of the AWLs contain all of the critical information, such as
maximum bonding resistances and minimum separation requirements. The
FAA Flight Standards Service will only accept operator manuals that
contain all of the information specified in the AWLs, so there is no
need to require
[[Page 25981]]
operators to use the OEM maintenance manuals.
Regarding JAL's request for clarification of approval of AWL
changes, we infer JAL is referring to the following sentence located in
the ``Changes to AMMs Referenced in Fuel Tank System AWLs'' section of
the NPRM: ``A maintenance manual change to these tasks may be made
without approval by the Manager, Seattle ACO, through an appropriate
FAA principal maintenance inspector (PMI) or principal avionics
inspector (PAI), by the governing regulatory authority, or by using the
operator's standard process for revising maintenance manuals.'' If
changes need to be made to tasks associated with an AWL, they may be
made using an operator's normal process without approval of the Seattle
ACO, as long as the change maintains the information specified in the
AWL. For some CDCCLs, it was beneficial to not put all the critical
information into the CMR. This avoids duplication of a large amount of
information. In these cases, the CDCCL refers to a specific revision of
the CMM. U.S. operators are required to use those CMMs. Any changes to
the CMMs must be approved by the Seattle ACO.
Request To Delete Reference to Task Cards
All Nippon Airways (ANA) requests that we delete the words ``and
task cards,'' unless the task card references are listed in Section D
of Document D6-13747-CMR or Appendix 1 of the AD. Those words are
located in the following sentence in the ``Ensuring Compliance with
Fuel Tank System AWLs'' section of the NPRM: ``Operators that do not
use Boeing's revision service should revise their maintenance manuals
and task cards to highlight actions tied to CDCCLs to ensure that
maintenance personnel are complying with the CDCCLs.'' ANA believes
that if a task card refers to the AMM, which includes the CDCCL note,
then highlighting the CDCCL items is not necessary because they are
already highlighted in the AMM and maintenance personnel always refer
to the AMM. ANA further states that the applicable task card references
are not listed in Section D of Document D6-13747-CMR, or in Appendix 1
of the NPRM; they refer only to the AMM. ANA, therefore, states that it
is difficult to find out or distinguish the affected task card.
JAL believes that the proposed requirement regarding the CDCCLs is
to incorporate the manufacturer's maintenance manuals into an
operator's maintenance manual. If the description of a CDCCL is missing
from the manufacturer's AMM, then JAL believes that operators are not
responsible for the requirements of the AD.
We agree that the task cards might not need to be revised because
an operator might find that the AMM notes are sufficient. However, we
disagree with deleting the reference to the task cards since some
operators might need to add notes to their task cards. This AD does not
require any changes to the maintenance manuals or task cards. The AD
requires incorporating new AWLs into the operator's maintenance
program. It is up to the operator to determine how best to ensure
compliance with the new AWLs. In the ``Ensuring Compliance with Fuel
Tank System AWLs'' section of the NPRM, we were only suggesting, not
requiring, ways that an operator could implement CDCCLs into its
maintenance program. We have not changed this AD in this regard.
Request To Clarify Meaning of Task Cards
JAL requests that we clarify whether ``task cards,'' as found in
the ``Recording Compliance with Fuel Tank System AWLs'' section of the
NPRM, means Boeing task cards only or if they also include an
operator's unique task cards.
We intended that ``task cards'' mean both Boeing and an operator's
unique task cards, as applicable. The intent is to address whatever
type of task cards are used by mechanics for maintenance. This AD would
not require any changes to the AMMs or task cards relative to the
CDCCLs. We are only suggesting ways an operator might implement CDCCLs
into its maintenance program. No change to this AD is necessary in this
regard.
Request To Delete Reference to Parts Manufacturer Approval (PMA) Parts
ANA requests that we delete the words ``Any use of parts (including
the use of parts manufacturer approval (PMA) approved parts),'' unless
a continuous supply of CMM specified parts is warranted or the FAA is
open 24 hours to approve alternative parts for in-house repair by the
operator. Those words are located in the following sentence in the
``Changes to CMMs Cited in Fuel Tank System AWLs'' section of the NPRM:
``Any use of parts (including the use of parts manufacturer approval
(PMA) approved parts), methods, techniques, and practices not contained
in the CMMs needs to be approved by the Manager, Seattle ACO, or
governing regulatory authority.''
ANA states that in some cases the parts specified in the CMMs
cannot be obtained from the parts market or directly from the component
vendor, so an operator is forced into using alternative parts to keep
its schedule. ANA requests that we direct the component vendor to
ensure a continuous supply of CMM parts and to direct the component
vendor to remedy a lack of parts if parts are not promptly supplied.
ANA further requests that we direct the component vendor to promptly
review the standard parts and allow use of alternative fasteners and
washers listed in Boeing D590. ANA asserts that, in some cases, a
component vendor specifies the uncommon part to preserve its monopoly.
We disagree with revising the ``Changes to CMMs Cited in Fuel Tank
System AWLs'' section of the NPRM. We make every effort to identify
potential problems with the parts supply, and we are not aware of any
problems at this time. The impetus to declare overhaul and repair of
certain fuel tank system components as CDCCLs arose from in-service
pump failures that resulted from repairs not done according to OEM
procedures. We have approved the use of the CMMs--including parts,
methods, techniques, and practices--at the revision levels specified in
Revision March 2008 of Document D6-13747-CMR. Third-party spare parts,
such as parts approved by PMA, have not been reviewed.
An operator may submit a request to the Seattle ACO, or governing
regulatory authority, for approval of an AMOC if sufficient data are
submitted to substantiate that use of an alternative part would provide
an acceptable level of safety. The CDCCLs do not restrict where repairs
can be performed, so an operator may do the work in-house as long as
the approved CMMs are followed. If operators would like to change those
procedures, they can request approval of the changes. The FAA makes
every effort to respond to operators' requests in a timely manner. If
there is a potential for disrupting the flight schedule, the operator
should include that information in its request. Operators should
request approval for the use of PMA parts and alternative procedures
from the FAA or the governing regulatory authority in advance in order
to limit schedule disruptions. We have not changed this AD in this
regard.
Request To Identify Other Test Equipment
JAL states that certain test equipment is designated in the CMR and
that additional equipment should also be designated. For example, AWL
No. 28-AWL-03 would require using loop
[[Page 25982]]
resistance tester, part number (P/N) 906-10246-2 or -3. Therefore, JAL
requests that we also identify alternative test equipment, so that
operators do not need to seek an AMOC to use other equipment.
We disagree with identifying other test equipment. We cannot
identify every possible piece of test equipment. We ensure that some
are listed as recommended by the manufacturer. With substantiating
data, operators can request approval of an alternative tester from the
Seattle ACO, or the governing regulatory agency. We have not changed
this AD in this regard.
Request to Clarify AWL No. 28-AWL-02
JAL requests that we clarify the intent of AWL No. 28-AWL-02. JAL
states that Chapters 53-01 and 53-21 of the Boeing 747 AMM specify
doing an inspection of the external wires over the center fuel tank
according to AMM 28-11-00 before installing the floor panel over the
center wing tank based on AWL No. 28-AWL-02. JAL also states that,
according to Revision March 2006 of Document D6-13747-CMR, AWL No. 28-
AWL-02 contains two limitations: maintaining the existing wire bundle
routing and clamping, and installing any new wire bundle per the Boeing
standard wiring practices manual (SWPM). Therefore, JAL believes it is
not necessary to inspect the external wires over the center fuel tank
according to AMM 28-11-00 before installing the floor panel over the
center wing tank, unless that wire bundle routing and clamping are
changed.
We point out that AWL No. 28-AWL-02 also contains a third
limitation: Verifying that all wire bundles over the center fuel tank
are inspected according to AWL No. 28-AWL-01, which refers to AMM 28-
11-00 for accomplishing the inspection. We do not agree that the
inspection should be required only if the wire bundle routing and
clamping are changed while maintenance is accomplished in the area. If
any of the other bundles have a clamp or routing failure, it must be
detected and corrected. After accomplishing the inspection required by
AWL No. 28-AWL-01, an operator would not need to repeat the inspection
for another 12 years. No change to this AD is necessary in this regard.
Request for Clarification for Recording Compliance With CDCCLs
JAL requests that we clarify the following sentence: ``An entry
into an operator's existing maintenance record system for corrective
action is sufficient for recording compliance with CDCCLs, as long as
the applicable maintenance manual and task cards identify actions that
are CDCCLs.'' That sentence is located in the ``Recording Compliance
with Fuel Tank System AWLs'' section of the NPRM. Specifically, JAL
asks whether an operator must indicate the CDCCL in their recording
documents or whether it is sufficient for the recording document to
call out the applicable AMMs that are tied to the CDCCLs.
We have coordinated with the FAA Flight Standards Service and it
agrees that, for U.S.-registered airplanes, if the applicable AMMs and
task cards identify the CDCCL, then the entry into the recording
documents does not need to identify the CDCCL. However, if the
applicable AMMs and tasks cards do not identify the CDCCL, then they
must be identified. Other methods may be accepted by the appropriate
FAA PMI or PAI, or governing regulatory authority. No change to this AD
is necessary in this regard.
Conclusion
We reviewed the relevant data, considered the comments received,
and determined that air safety and the public interest require adopting
the AD with the changes described previously. We also determined that
these changes will not increase the economic burden on any operator or
increase the scope of the AD.
Costs of Compliance
There are about 308 airplanes of the affected design in the
worldwide fleet. The following table provides the estimated costs, at
an average labor rate of $80 per work hour, for U.S. operators to
comply with this AD.
Estimated Costs
----------------------------------------------------------------------------------------------------------------
Number of U.S.-
Action Work Parts Cost per registered Fleet cost
hours airplane airplanes
----------------------------------------------------------------------------------------------------------------
Maintenance program revision..... 8 None................ $640 93 $59,520
Inspections...................... 8 None................ 640 93 59,520
----------------------------------------------------------------------------------------------------------------
Authority for This Rulemaking
Title 49 of the United States Code specifies the FAA's authority to
issue rules on aviation safety. Subtitle I, section 106, describes the
authority of the FAA Administrator. ``Subtitle VII: Aviation
Programs,'' describes in more detail the scope of the Agency's
authority.
We are issuing this rulemaking under the authority described in
``Subtitle VII, Part A, Subpart III, Section 44701: General
requirements.'' Under that section, Congress charges the FAA with
promoting safe flight of civil aircraft in air commerce by prescribing
regulations for practices, methods, and procedures the Administrator
finds necessary for safety in air commerce. This regulation is within
the scope of that authority because it addresses an unsafe condition
that is likely to exist or develop on products identified in this
rulemaking action.
Regulatory Findings
This AD will not have federalism implications under Executive Order
13132. This AD will not have a substantial direct effect on the States,
on the relationship between the national government and the States, or
on the distribution of power and responsibilities among the various
levels of government.
For the reasons discussed above, I certify that this AD:
(1) Is not a ``significant regulatory action'' under Executive
Order 12866,
(2) Is not a ``significant rule'' under DOT Regulatory Policies and
Procedures (44 FR 11034, February 26, 1979), and
(3) Will not have a significant economic impact, positive or
negative, on a substantial number of small entities under the criteria
of the Regulatory Flexibility Act.
You can find our regulatory evaluation and the estimated costs of
compliance in the AD Docket.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
Adoption of the Amendment
0
Accordingly, under the authority delegated to me by the Administrator,
[[Page 25983]]
the FAA amends 14 CFR part 39 as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
0
2. The FAA amends Sec. 39.13 by adding the following new AD:
2008-10-07 Boeing: Amendment 39-15513. Docket No. FAA-2007-28385;
Directorate Identifier 2006-NM-181-AD.
Effective Date
(a) This airworthiness directive (AD) is effective June 12,
2008.
Affected ADs
(b) None.
Applicability
(c) This AD applies to all Boeing Model 747-100, 747-100B, 747-
100B SUD, 747-200B, 747-200C, 747-200F, 747-300, 747SR, and 747SP
series airplanes, certificated in any category.
Note 1: This AD requires revisions to certain operator
maintenance documents to include new inspections. Compliance with
these inspections is required by 14 CFR 91.403(c). For airplanes
that have been previously modified, altered, or repaired in the
areas addressed by these inspections, the operator may not be able
to accomplish the inspections described in the revisions. In this
situation, to comply with 14 CFR 91.403(c), the operator must
request approval for an alternative method of compliance (AMOC)
according to paragraph (k) of this AD. The request should include a
description of changes to the required inspections that will ensure
the continued operational safety of the airplane.
Unsafe Condition
(d) This AD results from a design review of the fuel tank
systems. We are issuing this AD to prevent the potential for
ignition sources inside fuel tanks caused by latent failures,
alterations, repairs, or maintenance actions, which, in combination
with flammable fuel vapors, could result in a fuel tank explosion
and consequent loss of the airplane.
Compliance
(e) You are responsible for having the actions required by this
AD performed within the compliance times specified, unless the
actions have already been done.
Service Information Reference
(f) The term ``Revision March 2008 of Document D6-13747-CMR,''
as used in this AD, means Boeing 747-100/200/300/SP Airworthiness
Limitations (AWLs) and Certification Maintenance Requirements
(CMRs), D6-13747-CMR, Revision March 2008. (For the purposes of
Revision March 2008 of Document D6-13747-CMR, the Model 747SR series
airplane is basically a Model 747-100 series airplane with certain
modifications to improve fatigue life.)
Maintenance Program Revision
(g) Before December 16, 2008, revise the FAA-approved
maintenance program to incorporate the information in Section D,
``AIRWORTHINESS LIMITATIONS--SYSTEMS,'' AWLs No. 28-AWL-01 through
No. 28-AWL-19 inclusive, of Revision March 2008 of Document D6-
13747-CMR; except that the initial inspections required by paragraph
(h) of this AD must be done at the applicable compliance time
specified in that paragraph. As an optional action, AWLs No. 28-AWL-
20 through No. 28-AWL-23 inclusive, as identified in Section D of
Revision March 2008 of Document D6-13747-CMR, also may be
incorporated into the FAA-approved maintenance program.
Accomplishing the revision in accordance with a later revision of
Document D6-13747-CMR is an acceptable method of compliance if the
revision is approved by the Manager, Seattle Aircraft Certification
Office (ACO), FAA.
Initial Inspections and Repair if Necessary
(h) Do the inspections specified in Table 1 of this AD at the
compliance time specified in Table 1 of this AD, and repair any
discrepancy, in accordance with Section D of Revision March 2008 of
Document D6-13747-CMR. The repair must be done before further
flight. Accomplishing the actions required by this paragraph in
accordance with a later revision of Document D6-13747-CMR is an
acceptable method of compliance if the revision is approved by the
Manager, Seattle ACO. Accomplishing the inspections identified in
Table 1 of this AD as part of an FAA-approved maintenance program
before the applicable compliance time specified in Table 1 of this
AD constitutes compliance with the requirements of this paragraph.
Note 2: For the purposes of this AD, a detailed inspection is:
``An intensive examination of a specific item, installation, or
assembly to detect damage, failure, or irregularity. Available
lighting is normally supplemented with a direct source of good
lighting at an intensity deemed appropriate. Inspection aids such as
mirror, magnifying lenses, etc., may be necessary. Surface cleaning
and elaborate procedures may be required.''
Note 3: For the purposes of this AD, a special detailed
inspection is: ``An intensive examination of a specific item,
installation, or assembly to detect damage, failure, or
irregularity. The examination is likely to make extensive use of
specialized inspection techniques and/or equipment. Intricate
cleaning and substantial access or disassembly procedure may be
required.''
Table 1.--Initial Inspections
----------------------------------------------------------------------------------------------------------------
Compliance Time (whichever occurs later)
AWL No. Description -------------------------------------------------
Threshold Grace period
----------------------------------------------------------------------------------------------------------------
28-AWL-01............................ A detailed inspection Within 144 months since Within 72 months after
of external wires over the date of issuance the effective date of
the center fuel tank of the original this AD.
for damaged clamps, standard airworthiness
wire chafing, and wire certificate or the
bundles in contact date of issuance of
with the surface of the original export
the center fuel tank. certificate of
airworthiness.
28-AWL-03............................ A special detailed Within 144 months since Within 24 months after
inspection of the the date of issuance the effective date of
lightning shield to of the original this AD.
ground termination on standard airworthiness
the out-of-tank fuel certificate or the
quantity indicating date of issuance of
system to verify the original export
functional integrity. certificate of
airworthiness.
28-AWL-13............................ A special detailed Within 144 months since Within 60 months after
inspection of the the date of issuance the effective date of
fault current bond of of the original this AD.
the fueling shutoff standard airworthiness
valve actuator of the certificate or the
center wing tank to date of issuance of
verify electrical bond. the original export
certificate of
airworthiness.
----------------------------------------------------------------------------------------------------------------
No Alternative Inspections, Inspection Intervals, or Critical Design
Configuration Control Limitations (CDCCLs)
(i) After accomplishing the actions specified in paragraphs (g)
and (h) of this AD, no alternative inspections, inspection
intervals, or CDCCLs may be used unless the inspections, intervals,
or CDCCLs are part of a later revision of Revision March 2008 of
Document D6-13747-CMR that is approved by the Manager, Seattle ACO;
or unless the inspections, intervals, or CDCCLs are approved as an
AMOC in accordance with the procedures specified in paragraph (k) of
this AD.
[[Page 25984]]
Credit for Actions Done According to Previous Revisions of the Service
Information
(j) Actions done before the effective date of this AD in
accordance with Boeing 747-100/200/300/SP Airworthiness Limitations
(AWLs) and Certification Maintenance Requirements (CMRs), D6-13747-
CMR, Revision March 2006; Revision May 2006; Revision December 2006;
Revision January 2007; Revision September 2007; or Revision January
2008; are acceptable for compliance with the corresponding
requirements of paragraphs (g) and (h) of this AD.
Alternative Methods of Compliance (AMOCs)
(k)(1) The Manager, Seattle ACO, has the authority to approve
AMOCs for this AD, if requested in accordance with the procedures
found in 14 CFR 39.19.
(2) To request a different method of compliance or a different
compliance time for this AD, follow the procedures in 14 CFR 39.19.
Before using any approved AMOC on any airplane to which the AMOC
applies, notify your appropriate principal inspector (PI) in the FAA
Flight Standards District Office (FSDO), or lacking a PI, your local
FSDO.
Material Incorporated by Reference
(l) You must use Boeing 747-100/200/300/SP Airworthiness
Limitations (AWLs) and Certification Maintenance Requirements
(CMRs), D6-13747-CMR, Revision March 2008, to do the actions
required by this AD, unless the AD specifies otherwise.
(1) The Director of the Federal Register approved the
incorporation by reference of this service information under 5
U.S.C. 552(a) and 1 CFR part 51.
(2) For service information identified in this AD, contact
Boeing Commercial Airplanes, P.O. Box 3707, Seattle, Washington
98124-2207.
(3) You may review copies of the service information
incorporated by reference at the FAA, Transport Airplane
Directorate, 1601 Lind Avenue SW., Renton, Washington; or at the
National Archives and Records Administration (NARA). For information
on the availability of this material at NARA, call 202-741-6030, or
go to: http://www.archives.gov/federal_register/code_of_federal_
regulations/ibr_locations.html.
Issued in Renton, Washington, on April 28, 2008.
Ali Bahrami,
Manager, Transport Airplane Directorate, Aircraft Certification
Service.
[FR Doc. E8-9896 Filed 5-7-08; 8:45 am]
BILLING CODE 4910-13-P
Browse by Year
/ 2008
/ May
/ Thursday, May 08, 2008
Savings - New York Hotel - Mortgage - Secured Loans
|
|